Crews from Knox County Engineering and Public Works were working all over the county over the past two weeks. Projects pictured below include:
- Grassy Creek – Installation of base stone for turn lane
- Northshore Greenway – Grading operation and installation of base stone
- Clapps Chapel – Replacement of culvert cross drain
- Washington Pike – Installation of new culvert cross drain within existing culvert (slip lined) to repair corroded bottom of existing culvert
- Ruggles Drive – Asphalt paving short section of damaged roadway
- Campbell Station Drive – Asphalt paving short section of damaged roadway
- Grading and installation of gravel parking lot for the Brickyard boat ramp
- McNeely Road – roadway repair
Mike Donila is communications director for Knox County government.